We have recently completed a 30 kW solar PV installation undertaken on behalf of steel fabrication specialists Leach Brothers at their workshop in Witheridge. Customer requested a combination of string and hybrid inverters, to allow the addition of battery storage to maximise the utilisation of their generation. The solar panels layout was designed to work around the existing rooflights to the building, to ensure retention of natural lighting.
Estimated annual generation 28,625 kWh